Alatas 1988 - 2008 20 Year Anniversary Alatas crane repair of top steel sheaves after accident alatas

Alatas Hong Kong opened in 2005. Directed by Rainer Schmied, a long time after-sales manager with Liebherr. Alatas Hong Kong provides crane spare parts and crane repair services for maritime cranes and construction cranes in Hong Kong, China and in the Asian Region.Alatas Crane Services - Posts FacebookALATAS approach was to remove the four winch support pins and replacing them with dummy pins so it could easily come off. After the winch arrived at the ALATAS Norway workshop, the hydraulic motor and primary brake was lifted off, and the winch was further stripped down, inspected and then re built with new, ALATAS supplied planetary gear parts.

Boom hoist wire rope line failure results in fatality high repair of top steel sheaves after accident alatas

Figure 19 - Boom location after failure, and bridle sheave path 25 Figure Crane and failure points 26 Figure 21 - Middle section of boom hoist wire rope, post-accident 29 Figure 22 Reeved drum of boom hoist wire rope, with evidence of external strand corrosion 30 Figure 23 - Corroded boom hoist wire rope wedge socket, pinned toChesapeake 17 Bow Repair and Refinishing : Builders' Forumi have done this same repair after an accident with a boat and broke off about two inches of the bow. so i just reglued it on with epoxy and faired it in reglassed. my hull was painted so after i was done, the repair was not detectable. you do appear to have some water damage.Chrysler PT Cruiser repairs and fixes - PTCruizerYou may have to crawl into the cargo area and gently remove the plastic trim panel pieces starting at the top, remove the 3rd brake light trim. Everything is plastic push

Complete Overhaul of 4 pcs SMAG-Peiner Grabs by ALATAS repair of top steel sheaves after accident alatas

ALATAS was asked to take over, remove the grab from the yard and complete the repair of 4 Nos. of grabs in ALATAS workshop on a top urgent basis, as the vessel was to sail. The time frame was 6 days only, but utilizing all resources and working day and night on a 24 7 basis, ALATAS Singapore managed to complete the repairs in time.Construction - SteelConstructionfoCranes and MEWPs (Mobile Elevating Work Platforms) are predominantly used for the erection of structural steelwork for buildings and bridges in the UK, although other techniques are sometimes used for steel bridge construction.Generally, cranes may be divided into two broad categories, mobile and non-mobile. The first category includes truck mounted cranes, crawler cranes and all-terrain repair of top steel sheaves after accident alatasConveyor Belt Guide, with tons of free infoAug 25, 2020 · Predictive maintenance that helps avoid a repair cost can be difficult to quantify. repair of top steel sheaves after accident alatas The video on top of this page shows this system. The mine Prosper-Haniel was the last one to close. repair of top steel sheaves after accident alatas The department of mineral resources will proceed with an investigation into the cause of the accident at Palabora Mining Company, soon after the fire repair of top steel sheaves after accident alatas

Cranes Archives Alatas

May 11, 2020 · Alatas Service Field Service Location Singapore Model EH36 Alatas was tasked with the sheave overhaul and repair the EH36 top steel sheaves column structure after it had collapsed after an accident. After we assessed the GA of the vessel, we found the adjacent crane could not reach the repair location where itd be required to EH36 Steel Sheaves Repairs After Accident Read More »DO NOT RETURN DOOR TO STORE1) Lubricate all moving parts of the door with light household oil, including a) Lift cables at the bottom bracket button b) Bearing of the sheaves c) Lock hardware where surfaces turn or slide d) Full length of torsion spring to reduce friction between coils e)Lubricate steel rollers. DO NOT lubricate nylon rollers.Dongnam boom repairs carried out in Alatas specialist repair of top steel sheaves after accident alatasAlatas carried out a repair in their specialist workshops which included renewing the hoist motor seating arrangement, forming a high tensile steel box section as per specialist engineering fabrication drawings. The jib heel clevises, luff and head blocks and access gantry and handrails.

EH36 Archives Alatas

Mar 04, 2020 · Alatas Service Field Service Location Singapore Model EH36 Alatas was tasked with the sheave overhaul and repair the EH36 top steel sheaves column structure after it had collapsed after an accident. After we assessed the GA of the vessel, we found the adjacent crane could not reach the repair location where itd be required to EH36 Steel Sheaves Repairs After Accident Read More »EH36 Steel Sheaves Repairs After Accident Singapore AlatasMar 04, 2020 · Alatas Service Field ServiceLocation SingaporeModel EH36. Alatas was tasked with the sheave overhaul and repair the EH36 top steel sheaves column structure after it had collapsed after an accident. After we assessed the GA of the vessel, we found the adjacent crane could not reach the repair location where itd be required to perform the lifting of the damaged steel bracket sheaves and Job Report Archives Page 3 of 16 AlatasJun 23, 2020 · Alatas Service Field Service Location Singapore Model EH36 Alatas was tasked with the sheave overhaul and repair the EH36 top steel sheaves column structure after it had collapsed after an accident. After we assessed the GA of the vessel, we found the adjacent crane could not reach the repair location where itd be required to EH36 Steel Sheaves Repairs After Accident Read More »

OPERATIONS MANUAL tidetamer

Nylon rollers and or sheaves should be inspected annually and lubricated as needed. Aluminum Stainless steel sheaves require monthly greasing as needed There are 4 grease itting per top beam assembly and they should be greased annually.OSHA's Hazard Exposure and Risk Assessment Matrix for repair of top steel sheaves after accident alatasThis sheet should be used in conjunction with the activity sheet for the particular activity in which the heavy equipment is being used (e.g., building demolition, bridge repair). As a result of Hurricanes Katrina and Rita's (2005) high winds and floodwaters, many structures are unsound and in need of demolition or repair.Ocean Star - Marine Accident Investigation Branch repair of top steel sheaves after accident alatasParticulars of Ocean Star and accident Background Narrative Environmental conditions Ocean Star 1.5.1 The vessel 1.5.2 The crew Post accident examination of the block assembly 1.6.1 Visual examination of the block assembly 1.6.2 Disassembly and analysis of the sheave block Summary of the conclusions reached by The Test House 1.7.1 Main repair of top steel sheaves after accident alatas

Overhead Conductor Installation Guide

6.6 Angle Changes (Breakover Sheave and Sheave Diameter) pg 13 6.7 Support of Stringing Sheaves at Angles pg 13 Figure 8 Supporting of Stringing Sheaves at Angles pg 14 6.8 Recommended Maximum Pulling Tension pg 14 6.9 Conductor Side Wall Bearing Pressure pg 15 6.10 Time in Stringing Sheaves pg 16 6.11 Pre-Tensioning pg 16Sheaves Archives AlatasMar 04, 2020 · REGION SINGAPOREMODEL EH36SERVICE Field Service Repairs Alatas was tasked to repair the top steel sheaves column structure after it had collapsed after an accident. After we assessed the GA of the vessel, we found the adjacent crane could not reach the repair location where itd be required to perform the lifting of the damaged steel The Case of the Crushed Cable designnewsWheeled outriders were used to keep the cable from contacting the joint between the top and side of the tank. The Scene of the Crime. The accident occurred on a day so windy a plastic shroud had been rigged over the platform and painters to allow painting to proceed. The platform was perhaps 30 ft in the air when one of the cables snapped.

UNITED STATES DEPARTMENT OF LABOR MINE SAFETY

Loads were picked using a ¾-inch-diameter wire rope. At the point sheave of the crane, the wire rope was reeved around the point sheaves and the load block sheaves using a five-part-line configuration. The load block was a McKissick 35-ton capacity, 3 Sheave, size 14RB Figure 333. The boom was supported at its tip by two fixed 1 3 8 -inch-Wire Rope Parted After Years of Neglect and Daily InspectionsThe Pandemic's Effects on the Ship Repair Industry. By Wendy Laursen 10-18-2020 09:19:04 The word disruption has been used and overused to the point of becoming a cliché, but there's one repair of top steel sheaves after accident alatascomprehensive crane boom repair and crane repair of top steel sheaves after accident alatas - alatas.asiaHeavy corrosion caused excessive wear on the boom top structure connecting the boom main section with the boom head accommodating all luffing and hoist wire sheaves. For the boom top section repair it was necessary to separate the boom head from the main section and to re-join after replacing large areas of corroded 6mm sheets.